NOW WITH TWO OFFICES!
HEAD OFFICE:
COLORADO
NEW OFFICE:
UTAH
5621 West Wells Park Rd
West Jordan, UT 84081
(801)-886-2111
9885 Emporia Street
Henderson, CO 80640
BTRENCHLESS AND HDD WILLCO ARE JOINING FORCES! WE ARE VERY EXCITED TO WELCOME
TEAM HDD TO BTRENCHLESS!
5621 West Wells Park Rd
West Jordan, UT 84081
801-886-2111
WE ARE BTRENCHLESS
For over four decades, BTrenchless has consistently managed some of the most challenging projects across the western United States. As an integral part of BT Construction, BTrenchless has risen to prominence as one of Colorado and Utah’s most respected contractors, specializing in underground trenchless technologies. Our numerous specialty crews, dedicated staff and large inventory of state-of-the-art equipment solidifies BTrenchless as a forefront leader within the trenchless industry.
From simple substrates to complex contaminated soils, BTrenchless consistently exceeds industry benchmarks. Our trenchless crews specialize in a diverse range of methods including auger boring, guided boring, hand tunneling, pipe ramming, microtunneling, tunnel boring, pipe-bursting, sliplining, and horizontal directional drilling.
1980
Year Established
Over
1.5K
Projects Completed
SERVICES
AUGER BORES
Auger boring simultaneously jacks the casing forward while removing the spoil via rotating auger blades. BTrenchless utilizes Auger Boring as an inexpensive installation method for suitable ground conditions and tolerances in a wide range of casing diameters.
GUIDED BORING MACHINE (GBM)
Guided Boring Machine (GBM) is used in conjunction with the horizontal auger boring machine to install small-diameter pipes with greater grade and alignment precision. BTrenchless has multiple methods available for GBM, including pilot tube and McLaughlin.
HAND TUNNELING
Hydraulic jacks advance the tunnel while our highly experienced and trained crews excavate the material at the tunnel face by hand or with a small excavator.
HAMMER & PIPE RAMMING
A pneumatic ramming tool drives the casing forward without removal of spoils. Spoils are removed by various methods, dependent on soil types, after casing is in place.
HORIZONTAL DIRECTIONAL DRILLING (HDD)
A Directional Boring Machine operates by using a rotating drill pipe with a connected drill bit to bore and push into ground, which creates a borehole. The drill pipe is guided through the boring process by means of drilling fluids and a locating device, until it emerges on the opposite side of the boring project. A reaming tool is then attached to the drill pipe and pulled back through the borehole, drilling it to a larger circumference and clearing the path to pull back the pipe string. Bores can range from 2” to 36” in diameter and in lengths that range from 100 foot up to 3000 feet. This innovative and reliable method of product installation reduces surface disturbance and allows for shorter completion times.
MCLAUGHLIN OTS BORING
The McLaughlin On-Target system is used to install bores up to 400 feet. It’s guidance system is equipped with a water level and two enclosed halogen lights for checking and maintaining grade. The cutting path is controlled by hydraulic actuated flaps to regulate the direction of the bore, providing more accuracy.
MICROTUNNELING (MTBM)
Micro-Tunneling is generally defined as remotely controlled pipe-jacking (personnel-entry is not required) whereby the soils at the cutter face are controlled to maintain balance. Muck removal is conducted by a pressurized slurry transport via variable frequency controlled centrifugal pumps. BTrenchless has the most advanced information and control system available, located for easy access by the operator.
PIPE BURSTING
Trenchless method for replacing a host pipe by fragmenting the existing pipe and installing a completely new pipe of equal or lesser diameter.
SLIPLINING
A process by which an appropriately sized liner pipe is inserted into an existing pipe. The new pipe can be pulled in place using a cable and winch system, pushed in place using a choker cable and backhoe, or carried in place with a pipe carrier cart.
DESIGN - BUILD
Lending a contractor point of view to engineers and owners through constructibility reviews allowing them to account for certain previously unconsidered aspects of a project, producing superior project delivery for our municipal partners.
PROJECTS
ASSOCIATIONS
CONTACT
Colorado Office
9885 Emporia Street
Henderson, CO 80640
Utah Office
5621 West Wells Park Rd
West Jordan, UT 84081
Inquiries
Have questions?
We've got answers!
What's your next project?
Let's build it!